h1

Part J Regulations for You: Hidden Gas Flues Need Access Panels

November 15, 2016

SEL7130-7100

Ever since Part J Regulations came into force in January 2013, access panels have become a vital part of the heating engineer’s stock in trade.

  • Any gas boiler system with a hidden flue MUST have an access panel
  • Access panels should allow visual inspection within 1.5m of any joint or bend
  • Any existing acoustic or fire rating must be maintained
  • A carbon monoxide alarm with a long-term power source must be fitted 1 – 3m from the boiler

If any of these conditions are not met, the Gas Safe engineer is obliged to mark the boiler ‘at risk’ and instruct that it be switched off until access panels are fitted.

SEL7105-7108-7110-7120

TBS stocks a range of access panels, from Select Products. Ideal for when you need to provide access to a fixture behind a ceiling or a stud wall – or create access where it was forgotten!

The standard panels are made of heavy duty plastic. We can offer you the following sizes:

105 x 158 mm at £9.98

162 x 238mm at £12.48

300 x 300 mm at £18.73

Should you be working to specific fire regulations, we now stock a 300 x 300mm panel that is 1 hour fired rated, at £56.08.

This link (though using a different make) shows you how to fit an access panel into a ceiling.PFFD

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: